Javys, a.s.

Hledání


Zadejte výraz pro vyhledání:


Výsledek hledání:


1 «   9 . 10 . 11 . 12 . 13 . 14 . 15 . 16 . 17 . 18 . 19   » 26
(131) Page » The Strategic Partner, ČEZ

In the end of 2008 the Slovak Government has decided upon the strategic partner, ČEZ.

(132) Page » Transport of RAW and SNF

EXECUTION OF RADIOACTIVE MATERIALS TRANSPORT The company JAVYS, a. s., performs transport of: Spent nuclear fuel, Radioactive waste, Institutional radioactive waste and captured radioactive materials.

(133) Page » V1 NPP Decommissioning

The decommissioning of a nuclear power plant is a complex process and is, in many aspects, different from the dismantling of non-nuclear facilities. During the operation of the nuclear power plant, as well as during the process of decommissioning, with the reactor being shut down and nuclear fuel being removed, discipline, systematic approach to work, quality and control of the entire process and high level of safety culture in project management must be maintained.

(134) Page » V1 NPP Milestones

24th April 1972 beginning of the construction of the V1 NPP 7th November 1978 beginning of the insertion of nuclear fuel into the Unit 1 reactor 27th November 1978 minimal controlled ...

(135) Page » Vitrification Facility

Vitrification is a high-temperature process of fixation of liquid RAW, originally used for cooling of fuel elements after their removal from reactor of A1 NPP into a glass matrix. From the point of view of long-term safe storage, the vitrification product exhibits high chemical resistance, long-term stability and low level of maceration of the fixed radioactive nuclides.

(136) Page » Waste Water Cleaning Station

Its purpose is to clean low-contamination waste water produced in the A1 NPP decommissioning process or the radioactive waste processing processes running at The Technology for the Processing and Treatment of RAW facilities.

(137) Page » What is Radioactivity

Radioactivity represents natural or artificially caused change of atom nucleus accompanied with emission of radioactive radiation. Artificial radioactivity is disintegration of atom nucleus (nuclide) activated by artificial submission of energy to nucleus in such a way that it becomes unstable and it disintegrates usually into two smaller nuclei with simultaneous emission of radiation alpha, beta or gamma.

(138) Page » Why there is a new assessment process

V1 NPP decommissioning was subject to Environmental Impact Assessment in the years 2006-2007 with the aim of selecting the optimum alternative of its decommissioning. As a result of the assessment, the Immediate Decommissioning Alternative was selected.

(139) Page » _Sale of SS pumps and HDV valves

Nuclear and Decommissioning Company (JAVYS, plc.

(140) Press Releases » A successful year for Jadrová a vyraďovacia spoločnosť, a.

In 2014, the company JAVYS, a.s. achieved an after tax profit of EUR 12.060 million. The profit before tax was EUR 20.917 million, which represents an annual increase of 23.

1 «   9 . 10 . 11 . 12 . 13 . 14 . 15 . 16 . 17 . 18 . 19   » 26
detail
detail