Modification of Cooling and Service Water Systems, and Raw Water Inlet System
Project identification: A5-C
Project nameModification of Cooling and Service Water Systems, and Raw Water Inlet System
project statusFinished
DescriptionObjectives: during the period of V1 pre-decommissioning, a substantial reduction in water consumption is expected. The total water consumption will drop significantly in particular before the end of the pre-decommissioning period. In spite of this, some water supply and circulation will have to be preserved for safety and operational reasons. Thus, the modification of water systems shall enable:
- to continue supplying water to operating consumers,
- to minimise the number of items in operation,
- to facilitate the decommissioning process,
- to cope with the new operational conditions during shutdown and predecommissioning period,
- to provide maximal flexibility with regard to the process of decommissioning,
- to continue the A1 NPP, RWTC and V1 NPP operation without any disturbances.