Dismantling of the Technical Equipment in the V1 NPP Turbine Hall

Gallery

Project identification: D1.2

Project name

Dismantling of the Technical Equipment in the V1 NPP Turbine Hall

project status

Completed

Description

Objectives: to cover all activities related to the dismantling of the V1 NPP Turbine Hall (SO490:V1), turbine plinth (SO491:V1) and lengthwise intermediate buildings (SO800/b:V1 and SO800/c:V1) level +14.70 m, i.e. dismantlement of equipment and hardware inside the building and related activities, including plans and all documentation required, all the tools and equipment to be used, the classification and segregation of waste, of metal parts, the management of materials and waste depending on their destination (recycling, reuse or disposal).

The dismantling of the equipment in the buildings (e.g. turbines, electric generators, pipes, tanks, heat exchangers, pumps, valves, electrical and I&C equipment) and the turbogenerators plinths will be carried out with the aim to use the Turbine Hall as a covered area for different purposes (e.g. storage place, workplaces, others). The produced waste will be processed at specialised workplaces established in the Turbine Hall immediately after it is dismantled and made available.

detail
detail