Dismantling of Insulation in the V1 NPP Controlled Area

Illustrative photo Gallery

Project identification: D4.3A

Project name

Dismantling of Insulation in the V1 NPP Controlled Area

project status

Completed

Description

Objectives: the dismantling, sorting, decontamination, compacting, packing, transport and final disposal of thermal insulation materials from the controlled area of the V1 NPP at both Units 1 and 2. Processing, transport and disposal of RAW shall not be in the scope of BIDSF project D4.3A implementation.
The relevant activities are in the following buildings:
• Reactor building (CB 800)
• Auxiliary building (CB 801)
• Annex to Auxiliary building (CB 801a)
• Annex and Extension to V1 NPP Auxiliary building (CB 801/2)
• Connecting bridge between buildings CB 800 Reactor building – CB 801 Auxiliary Building (CB 804)
• Underground pipe duct between the buildings CB 800 Reactor building – CB 801 Auxiliary Building (CB 401 – PK-35)
• Cementation facility (CB 809)

 