Javys, a.s.

Hledání


Zadejte výraz pro vyhledání:


Výsledek hledání:


1 «   3 . 4 . 5 . 6 . 7 . 8 . 9 . 10 . 11 . 12 . 13   » 26
(71) Page » Plan of V1 NPP Decommissioning

Projects are divided into three basic groups: A.

(72) Page » Power Production and the Environment

During its twenty-eight years of service, the V1 NPP was a pillar of the electric network of the former Czechoslovakia and of the Slovak electric network right after the foundation of the Slovak Republic.

(73) Page » Pre-Feasibility Study on the Use of Final Disposal ...

Project: „Development of Pre-Feasibility Study on the Use of Final Disposal System for Legacy and Radioactive Waste in Moldova, Mol9008“; Consortium: BGE TECHNOLOGY GmbH (DE) – JAVYS; Project Description: JAVYS, together with a German company BGE TECHNOLOGY, is a member of the consortium responsible for the development of the pre-feasibility study on the use of final disposal system for radioactive waste (RAW) in Moldova.

(74) Page » Preparation of V1 NPP Decommissioning

The Government of the Slovak Republic adopted the pledge to shut down units of V1 NPP, gradually, Unit 1 in 2006 and Unit 2 in 2008.

(75) Page » Procurement-SIEA

Control over public procurement carried out by Recipient of financial means from the EU Funds is performed by the National Agency in line with the Act on Public Procurement No. 343/2015 Coll. the National Agency performs control of the contracts to which the Act on public procurement does not apply or which it defines in §1 of the Act on public procurement.

(76) Page » Production of fibre-concrete containers

References:   Since 2001 the low level waste of all producers in the Slovak Republic that comply with the acceptance criteria has been stored in the fibre-concrete containers at the National Radioactive Waste Repository.

(77) Page » Program of Development of Deep repository in Slovak Republic

Works on the project of development of the deep geological repository started in 1994 and they were continuation of works performed in the former CSFR. The project is financed from the Government fund for liquidation of nuclear energy facilities and treatment of spent nuclear fuel and radioactive waste.

(78) Page » Progress in decommissioning process

Main activities of the V1 NPP decommissioning implementation: Tag-out activities and disconnection of systems, Implementation of projects – dismantling of unnecessary equipment and systems, Management ...

(79) Page » Project Changes and Reconstructions

The Initial Technological Improvements Project Changes The Initial Technological Improvements and Project Changes the addition of shielding cartridges for decreasing the neutron flow in the reactor’s ...

(80) Page » Public participation process

The purpose of incorporating public participation into the decision making process is to increase the quality of decisions by creating and implementing possibilities for project acceptance from various points of view.

1 «   3 . 4 . 5 . 6 . 7 . 8 . 9 . 10 . 11 . 12 . 13   » 26
detail
detail