Hledání
Search result:
The company JAVYS, a.s. has a significant position in the Central Europe and represents a respected partner also for foreign companies by its responsible and competent assurance of the back-end part of nuclear power engineering focusing on safety, quality and protection of the environment.
Information on the project: In August 2019 the Contract for implementation of the V1 NPP decommissioning project D4.
Company JAVYS, a.s. has appointed two data protection officers, who you can refer to if you have any questions related to processing of personal data within our company, sending your request/question to:
There is a large number of nuclear power facilities worldwide that were constructed in the second half of the last century. After expiration of validity of license for operation, these facilities have to be shut down and consequently decommissioned.
Deep geological repository means that radioactive waste and spent nuclear fuel, after period of temporary storage, is placed in a big depth (300–1,000 meters) in geological environment, which is very stable from long-term point of view.
Nuclide is a substance composed of the same atoms determined by the proton number Z (i.e. by number of protons - electrically positively charged structural elements of atom's nucleus) and by the nucleon number A (i.
The European Union, represented by the European Commission, on the one part, and SIEA (Slovak Innovation and Energy Agency) as the National Agency on the other part executed the Delegation agreement on ...
Legislation of European Union requires Member Countries to build capacities for disposal of radioactive waste. As a part of solving this problem there are national programs for development of deep geological repositories for spent nuclear fuel and high level radioactive waste.
JAVYS, a. s. operates nuclear facility of National Radwaste Repository. In this repository is stored radioactive waste isolated from the environment, what is the final step in the entire process of their management.
DocumentIssue date Size Comments Stakeholder Engagement Plan (SEP) 17. 5. 2013 806 kB - Preliminary Enviromental Study 17. 6. 2013 15,25 MB - EIA REPORT - non technical executive summary 4. 2. 2014 264 kB - EIA REPORT - final edition 4. 2. 2014 21,6 MB