Hledání


Type a search term:


Search result:


1 . 2 . 3 . 4 . 5 . 6 . 7 . 8 . 9 . 10   » 27
(31) Page » History

The forming of this company is tightly related to the privatization of the Slovenské elektrárne company. One of the major postponing conditions in the transaction documents on the privatization of Slovenské elektrárne, was the detachment of selected nuclear assets (detached plants SE-VYZ and SE-EBO V1), in which the Italian ENEL company was not interested.

(32) Page » History

The A1 NPP was the first nuclear power plant in the former CSSR. Work on the projects started in 1956. The A1 Power plant was designed as an experimental facility so it could verify the feasibility of using uranium as reactor fuel.

(33) Page » Increasing Nuclear Safety

Ever since the beginning, a high operational safety standard was maintained at the V1 nuclear power plant. A perfect knowledge of the facility, technical competence and qualified approach reflected on the proposed and the realized changes.

(34) Page » Information Center

The company JAVYS invites all persons interested in the field of nuclear power industry to visit a new information center near V1 NPP site in Jaslovské Bohunice. During a free tour you can watch a 3D movie about V1 NPP decommissioning and look at the models of V1 NPP, reactor WWER 440 or Bohunice site and see other interesting exhibits.

(35) Page » Information on personal data processing for Contractors

In connection with processing of your personal data by company Jadrová a vyraďovacia spoločnosť, a.s.

(36) Page » Information on personal data processing for public and visitors

In  connection with processing of your personal data by company Jadrová a vyraďovacia spoločnosť, a.s.

(37) Page » Information on public consultation process

Not relevant events ongoing currently.

(38) Page » Information on public hearings

Not relevant events ongoing currently.

(39) Page » Integral RAW storage facility

The reason for the preparation of the realization of the integral RAW storage facility is the securing of storage of solid waste, treated using various technologies, from the decommissioning of nuclear facilities, until these can be reintroduced back into the environment, or transported to the site of their definitive storage.

(40) Page » Integrated Management System

An Integrated Management System (hereinafter referred to as “IMS”) is a management system, in which each employee has his/her specific position, tasks, competencies, responsibilities and appropriate powers/authority.

1 . 2 . 3 . 4 . 5 . 6 . 7 . 8 . 9 . 10   » 27
V1 NPP Decommissioning A1 NPP Decommissioning Spent Nuclear Fuel Management Management of Institutional Radioactive Waste and Captured Radioactive Materials RAW Management Transport of RAW and SNF Commercial activities