Hledání


Type a search term:


Search result:


1 «   2 . 3 . 4 . 5 . 6 . 7 . 8 . 9 . 10 . 11 . 12   » 27
(61) Page » News and events

Not relevant events ongoing currently.

(62) Page » Nuclear Safety

The general goal of nuclear safety is to protect individuals, the society and the environment by determining and maintaining efficient protection against nuclear hazards. Meeting the requirements of nuclear safety is top priority to JAVYS.

(63) Page » Ochrana životného prostredia - Systém environmentálneho manažérstva

Sprísňovanie environmentálnych zákonov, plnenie cieľov a priorít štátnej environmentálnej politiky, narastanie záujmu zainteresovaných strán o problematiku trvalo udržateľného rozvoja, ako aj zvýšenie konkurenčnej výkonnosti a zodpovednosť za znečisťovanie, núti organizácie prehodnotiť svoj stav a zaviesť účinné a efektívne manažérske systémy.

(64) Page » Operation Evaluation

The operation of the V1 was reliable, safe, ecological and economically advantageous and it confirmed the soundness of the company’s decision to generate electricity using these means. This can further be documented by the results of some technical-economic indicators.

(65) Page » Operation Termination and Decommissioning Preparation

In accordance with the Slovak Republic Government resolution No. 801/1999 and selected alternative for immediate decommissioning, the two V1 NPP units were definitively shut down in line with relevant Time schedule.

(67) Page » P67 - Strengthening CBRN Waste Management Capabilities

JAVYS is member of a diverse and skilled European consortium for EU funded CBRN project to enhance the management, handling and disposal of hazardous CBRN waste material. The purpose of this project is to support the long-term objectives of the governments of the South-East and Eastern European (SEEE) region partner countries.

(68) Page » Plan of V1 NPP Decommissioning

Projects are divided into three basic groups: A.

(69) Page » Power Production and the Environment

During its twenty-eight years of service, the V1 NPP was a pillar of the electric network of the former Czechoslovakia and of the Slovak electric network right after the foundation of the Slovak Republic.

(70) Page » Pre-Feasibility Study on the Use of Final Disposal ...

Project: „Development of Pre-Feasibility Study on the Use of Final Disposal System for Legacy and Radioactive Waste in Moldova, Mol9008“; Consortium: BGE TECHNOLOGY GmbH (DE) – JAVYS; Project Description: JAVYS, together with a German company BGE TECHNOLOGY, is a member of the consortium responsible for the development of the pre-feasibility study on the use of final disposal system for radioactive waste (RAW) in Moldova.

1 «   2 . 3 . 4 . 5 . 6 . 7 . 8 . 9 . 10 . 11 . 12   » 27
V1 NPP Decommissioning A1 NPP Decommissioning Spent Nuclear Fuel Management Management of Institutional Radioactive Waste and Captured Radioactive Materials RAW Management Transport of RAW and SNF Commercial activities