Most Important Performed Measures of Gradual Reconstruction

  • system of safety valves and relieving track of volume compensator,
  • system of superemergency feeding of steam generators with water,
  • system of by-passing stations of steam generators into the atmosphere,
  • system of electric feeding of own consumption from hydroelectric power plant Madunice,
  • system of emergency cooling of reactor’s active zone and spraying system,
  • system of fire prevention,
  • electro-technical systems,
  • system of inspection and control,
  • system of accidents localization in hermetic zone,
  • tightness and integrity of hermetic zone, system of filtered ventilation,
  • firmness of hermetic zone,
  • system of technical water,
  • air technology systems,
  • improvement of facilities seismic stability.