(101) Page » Second Stage of V1 NPP Decommissioning

The aim of the 2nd stage of V1 NPP decommissioning (2015-2027) is the decommissioning of structures and buildings in the power plant nuclear island, i.e. the reactor, steam generators, main reactor building, auxiliary operations building and remaining auxiliary buildings, which have not been decommissioned in the 1st stage of decommissioning.

(102) Page » Shareholder Agreement about the NNPS

On the 29th of May 2009, The JAVYS and ČEZ companies have signed an agreement about the construction of a new unit at the Jaslovské Bohunice power plant. According to law Nr. 211/2000 Z.z. about the freedom of access to information, the agreement was subsequently publicized.

(103) Page » Slovak legal provisions

The Environmental Impact Assessment procedure is governed in Slovak legislation by the Act of the National Council of SR No. 24/2006 Coll. of 14th December 2005 on Environmental Impact Assessment and on Alternations and Amendments to Some Acts, as amended (EIA Act).

(104) Page » Spent Nuclear Fuel Management

Spent nuclear fuel is the product of the process of electricity production in nuclear power plants. Spent nuclear fuel management belongs to the most challenging areas of nuclear energy industry in terms of environmental protection and the economy of fuel cycle.

(105) Page » Spent nuclear fuel transport

Provision of transport including a transport container and qualified staff References:   Slovenské elektrárne, a.s.

(106) Page » Storage and Deposition of RAW

According to the Atom Code, all the activities in the course of treatment of radioactive waste have to be directed to its safe storage. It is clear from this reason that storing and storage of RAW represents a very significant activity.

(107) Page » Storage Conception

Insulation of radioactive waste from environment and performance of requirements of supervisory bodies and legislation on required safety will be achieved in the deep repository by system of manifold engineering and natural barriers.

(108) Page » Strategy of company JAVYS, a.s.

The strategy of JAVYS, a.s.

(109) Page » Technical Parameters

Number of reactor units 2 Reactor electric output 440 MW Reactor type WWER 440 / V 230 Reactor thermal output 1,375 MWt Coolant and Moderator demineralized water     Reactor   Reactor ...

(110) Page » Technical Parameters of BRWTC

Evaporator  Type of facility continuous flow Operation continuous – campaign Heating medium steam, p = 0.