International Missions in the V1 NPP

1. The SIEMENS mission to evaluate the project and the safety levels / August–November 1990
2. The ČSFR (Czechoslovak Federal Republic) and Federal Ministry of Environment commission / August–November 1990
3. Austrian Government Mission/ August–October 1990
4. IAEA — Fact Finding Mission/ September 1990
5. IAEA — ASSET — serious operational incident evaluation mission / October 1990
6. IAEA — DOSART — project evaluation mission / April 1991 and April 1992
7. IAEA — ASSET — follow-up mission / July 1993
8. IAEA — PSA V1 NPP Peer Review mission / March 1993
9. IAEA — small reconstruction evaluation / July 1993
10. IAEA — structural seismic reinforcement reconstruction evaluation mission/ April 1994
11. IAEA — reactor pressure vessel annealing evaluation mission / March 1994
12. IAEA — LBB approach applicability evaluation mission / March 1994
13. IAEA technical inspection — positive results of the safety evaluation / May 1996
14. IAEA — safety evaluation of the gradual reconstruction / June 1998
15. WANO — partner inspection Peer Review / November 1998
16. IAEA — Bohunice site seismicity mission / November 1998
17. WENRA — nuclear safety and reliability / October 1999
18. IAEA — significant improvements results inspection, following the gradual reconstruction / November 2000

 

None of the expert missions requested the shutdown of the V1 NPP.