Javys, a.s.

Current projects

All projects

Filters

Project group:

A – Projects related to the V1 NPP operation termination
B – Documentation projects required for the decommissioning
C – Projects related to radioactive waste management
D – Projects related to decommissioning

Project status:
Project identification
Project identification Project name Project status
A1.1 PMU Consultant (Phase 1) Completed
A1.10 PMU Consultant (Phase 10) Implementation
A1.2 PMU Consultant (Phase 2) Completed
A1.3 PMU Consultant (Phase 3) Completed
A1.4 PMU Consultant (Phase 4) Completed
A1.5 PMU Consultant (Phase 5) Completed
A1.6 PMU Consultant (Phase 6) Completed
A1.7 PMU Consultant (Phase 7) Completed
A1.8 PMU Consultant (Phase 8) Completed
A1.9 PMU Consultant (Phase 9) Completed
A2.1 Development of comprehensive documentation necessary for V1 NPP decommissioning licensing phase and decommissioning implementation phase Completed
A2.2 Documentation configuration management system Completed
A3-A Reconstruction of Area protection system AKOBOJE Completed
A3-B Reconstruction of the Public Warning and Notification System Completed
A5-A1a Feasibility study for modification of the JAVYS and SE power supply scheme after V1 shutdown Completed
A5-A1b Temporary Reserve Power Supply of V1 and V2 NPP of 220 kV till 2012 Completed
A5-A2 Modification of the JAVYS power supply scheme after V1 final shutdown Completed
A5-A3 Optimisation of Electric Scheme Completed
A5-B1 Modification of heating and steam distribution system Completed
A5-B2 Reliable Heat and Steam Supply: Reconstruction of the Auxiliary Boiler Station at the Bohunice Site Completed
detail
detail