Current projects

All projects

Filters

Project group:

A – Projects related to the V1 NPP operation termination
B – Documentation projects required for the decommissioning
C – Projects related to radioactive waste management
D – Projects related to decommissioning

Project status:
Project identification
Project identification Project name Project status
A5-A2 Modification of the JAVYS power supply scheme after V1 final shutdown Finished
A5-A3 Optimisation of Electric Scheme Finished
A5-B1 Modification of heating and steam distribution system Finished
A5-B2 Reliable Heat and Steam Supply: Reconstruction of the Auxiliary Boiler Station at the Bohunice Site Finished
A5-C Modification of Cooling and Service Water Systems, and Raw Water Inlet System Finished
A5-D Modification to site supplies of essential fluids systems Finished
A5-E Spent fuel management Finished
A5-F Storage Casks for Spent Fuel Finished
A6/B8 PMU offices relocation and NPP V1 decommissioning information centre Finished
A7.1 Tag-out system Finished
A7.2 Definitive final tag outs plan V1 NPP (Stage 2) -TAG OUT of the systems Finished
B6.1 The V1 NPP Conceptual Decommissioning Plan Finished
B6.2 The Environmental Impact Assessment Report of V1 NPP Decommissioning Finished
B6.3 The V1 NPP Decommissioning 1st Stage Plan & Other Documentation Finished
B6.4 Decommisioning database Finished
B6.4A Decommissioning Database - technological upgrade Finished
B6.5 V1 NPP Decommissioning 2nd Stage Plan & Licensing Documentation Finished
B6.6A Decommissioning Support Surveys Realization
B6.7 Environmental Impact Assessment Report of 2nd Stage of V1 NPP Decommissioning Finished
B7.2 Personnel Training for the Purpose of 1st Stage of V1 NPP Decommissioning Finished
V1 NPP Decommissioning A1 NPP Decommissioning Spent Nuclear Fuel Management Management of Institutional Radioactive Waste and Captured Radioactive Materials RAW Management Transport of RAW and SNF Commercial activities