Javys, a.s.
Current projects
All projects
Project identification | Project name | Project status |
---|---|---|
Main power transformers | ||
Step-down transformers | ||
Switchyard Station r220 kV | ||
A1.1 | PMU Consultant (Phase 1) | |
A1.10 | PMU Consultant (Phase 10) | |
A1.2 | PMU Consultant (Phase 2) | |
A1.3 | PMU Consultant (Phase 3) | |
A1.4 | PMU Consultant (Phase 4) | |
A1.5 | PMU Consultant (Phase 5) | |
A1.6 | PMU Consultant (Phase 6) | |
A1.7 | PMU Consultant (Phase 7) | |
A1.8 | PMU Consultant (Phase 8) | |
A1.9 | PMU Consultant (Phase 9) | |
A2.1 | Development of comprehensive documentation necessary for V1 NPP decommissioning licensing phase and decommissioning implementation phase | |
A2.2 | Documentation configuration management system | |
A3-A | Reconstruction of Area protection system AKOBOJE | |
A3-B | Reconstruction of the Public Warning and Notification System | |
A5-A1a | Feasibility study for modification of the JAVYS and SE power supply scheme after V1 shutdown | |
A5-A1b | Temporary Reserve Power Supply of V1 and V2 NPP of 220 kV till 2012 | |
A5-A2 | Modification of the JAVYS power supply scheme after V1 final shutdown |